Case Studies

Cashco, Inc.

    90% Reduction in Need for Metal Tooling Work 75% Reduction in Time to Manufacture 3-Month Payback Period The Customer Cashco is a global industrial control manufacturer specializing… Read More »Cashco, Inc.

    Wärtsilä

      75% Total Weight Reduction 100K Euros Saved on Tooling 960kg Tested Lifting Capacity 240kg Certified Lifting Capacity The Customer Wärtsilä is a global leader in… Read More »Wärtsilä

      Onyx - Saint Gobain

      Saint-Gobain

        6 months To Achieve ROI 86% Cost Savings 90 Days Saved in Lead Time The Customer Saint-Gobain designs, manufactures, and distributes materials and solutions for… Read More »Saint-Gobain

        Guhring UK

          66% Time saved in production 75% Saved in low-volume tooling costs 60% Tool weight reduction The Customer Founded in 1973, Guhring UK — the Birmingham-based… Read More »Guhring UK

          Inconel 625 - Nieka Systems

          Nieka Systems

            $108KCAD Saved per year 86%Saved In lead time 1.5 Years To achieve ROI The Customer Nieka Systems creates sample preparation equipment that enables their customers… Read More »Nieka Systems